How much solar an AI server needs
Start with energy, not peak power. An AI server draws close to its full rating whenever it is rented. Using the compute program energy estimate (about 7 kW for 612 hours a month on an RTX PRO 6000 server, and about 14.3 to 14.5 kW around the clock on a B200 or B300), here is what that means at 80% and 100% of hours rented, using 1,250 kWh per kW of solar per year, a typical Minnesota planning number:
| Load | Energy a year | Solar to cover it | Planning roof area* |
|---|---|---|---|
| One RTX PRO 6000 server (8 GPUs) | About 44,000 to 51,000 kWh | About 35 to 41 kW | About 3,500 to 4,100 sq ft |
| One B200 or B300 server (8 GPUs) | About 108,000 to 127,000 kWh | About 86 to 102 kW | About 8,600 to 10,200 sq ft |
| Typical home, for comparison | About 10,000 kWh | About 8 kW | Most of one roof face |
| Your building | From your last 12 bills | We design it | We measure it |
*About 100 square feet of flat roof per kW including row spacing, as a rough planning number. Site power capacity, which also covers cooling and backup, is sized separately: about 9.4 kW per RTX PRO server and 18.5 to 18.8 kW per B200 or B300. Your design, roof condition and setbacks decide the real size. Farms and rural sites often use a ground-mount array.

Day production, 24-hour compute
Solar makes most of its power from mid-morning to mid-afternoon, and very little on short winter days. AI servers run day and night. There are three ways to bridge that:
- Net metering: extra daytime solar flows to the grid and earns credits you use at night. Credit rates and size limits depend on your utility and system size, so we check your rules before we design.
- Battery storage: store midday solar and run the servers on it after sunset. This matters most where exported power is credited below retail. Battery storage for AI compute.
- Partial coverage: cover the building fully and part of the AI load, and buy the rest. In low-rate North Dakota this can be the better math.

Using solar on site is worth more than exporting it
Every kWh of solar your servers use replaces a kWh you would buy at your full retail rate. On larger systems, exported kWh are often credited at less. AI compute gives solar owners a steady on-site load that soaks up daytime production, which is why existing solar sites are strong candidates. Many utilities also tie solar size limits to how much a site uses, so adding an AI load may let you install a larger array; we confirm this with your utility.
What solar for AI compute costs
Commercial solar often runs roughly $2.00 to $3.50 per watt before incentives, depending on size, roof or ground mount, and electrical work. Under current federal rules, commercial solar can qualify for a 30% credit if it is placed in service by the end of 2027; confirm with your tax advisor. At $2.50 per watt with the credit, our example works out to about 5.9 cents per kWh over 25 years paid in cash, against average commercial rates of 12.8 to 14.5 cents in Iowa, Minnesota, Wisconsin and Illinois.
| Example | Solar size | Cost after 30% credit | 25-year loan payment at 7.5% |
|---|---|---|---|
| Covers one RTX PRO server at full use | About 41 kW | About $72,000 | About $530 a month |
| Covers one B300 server at full use | About 102 kW | About $178,000 | About $1,310 a month |
| Covers a building with a $1,500 bill plus one RTX PRO server (Minnesota) | About 146 kW | About $256,000 | About $1,890 a month |
Compare the last row with today's $1,500 bill plus about $590 a month the server would add: the solar payment replaces both, and the hosting revenue is extra. Examples are estimates; we price every site.

Questions about solar for AI compute
Will solar run the servers in winter?
Not on its own on short, snowy days. Solar is sized on yearly output; net metering credits and the grid or a battery cover winter nights and storms.
Can I add AI compute to the solar I already have?
Often, yes. We check how much of your production you export today and whether your service and space can take a server.
Should solar cover 100% of the AI load?
Not always. Where power is very cheap, partial coverage can return more. The calculator lets you test 0% to 100%.
Size solar for your building and AI load
We design the array from your bills, your roof or land, and the servers you plan to host. Request an AI compute site assessment or call (763) 229-6662.
AI compute packages
One 8-GPU server each. Estimated using current program numbers.
Before loan payments and taxes, at 730 contracted hours a month and 10¢ power. Rental demand and rates can change; revenue is not guaranteed. Compare packages