AI compute hosting · Guide 11 of 17
Upper Midwest power prices and what it costs to run an AI server in each state.
Updated November 20, 2026 by Wolf River Electric.
Ready for the next step? Learn about free solar calculator from Wolf River Electric, or get a free quote.
Electricity prices in our states
| State | Commercial, June 2026 | National rank (1 = cheapest) | Industrial, August 2026 |
|---|---|---|---|
| North Dakota | 8.0 cents per kWh | 1 | 8.1 cents |
| South Dakota | 11.4 cents | 14 | 9.4 cents |
| Iowa | 12.8 cents | 25 | 9.3 cents |
| Minnesota | 13.7 cents | 28 | 10.0 cents |
| Wisconsin | 14.1 cents | 32 | 10.9 cents |
| Illinois | 14.5 cents | 36 | 11.3 cents |
Commercial figures and ranks: June 2026 EIA retail sales data compiled by WattRate (median of states about 13.3 cents). Industrial figures: August 2026 EIA Electric Power Monthly Table 5.6.A compiled by DC Hub (U.S. average about 9.6 cents). Your utility, rate plan and demand charges set your real cost, so we always work from your bills.
What powering an AI server costs by state
| State | One RTX PRO 6000 server, full use | One B300 server, full use |
|---|---|---|
| North Dakota | About $340 a month | About $850 a month |
| South Dakota | About $490 | About $1,210 |
| Iowa | About $550 | About $1,350 |
| Minnesota | About $590 | About $1,450 |
| Wisconsin | About $600 | About $1,490 |
| Illinois | About $620 | About $1,530 |
Based on the program energy estimate of about 4,300 kWh a month for the RTX PRO server and 10,600 kWh for the B300, at each state's average commercial rate.

What the numbers mean for hosting AI compute
- Cheap power helps, but demand matters more. Power runs about 4% to 6% of revenue in our examples. A server that is rented most of the time earns far more than the difference between states.
- North Dakota: grid power is cheap enough that partial solar, or solar sized mainly for the building, can make the most sense.
- Minnesota, Wisconsin and Illinois: rates are higher and tend to rise, so solar that locks in about 6 cents per kWh over its life is worth more.
- South Dakota and Iowa: moderate rates and strong solar output make a balanced design work well.

Other advantages of the Upper Midwest
Cold winters mean cooling equipment works less hard for much of the year, and server heat can even warm a shop or greenhouse (heat reuse). Many of our customers already own the roof, shop or land, which is one of the biggest costs of building a data center from scratch. And distributed sites avoid the long waits large data centers face for new grid connections.

Do state data center tax breaks apply?
Most state data center sales tax exemptions are written for large facilities with high minimum investments, so do not count on them for a single-server or small site. Ask your tax advisor what applies to your business.
Questions about power costs
Is my rate the same as the state average?
Probably not. Co-ops, municipal utilities and rate plans with demand charges vary widely. Enter your own rate in the calculator.
Which of your states is best for AI compute hosting?
The best site is the one with spare electrical capacity, fiber, space and a good roof or land. Power price is one factor among several. Read the site requirements.
Compare your site's numbers
We use your actual utility rates and bills, not state averages. Request an AI compute site assessment or call (763) 229-6662.
AI compute packages
One 8-GPU server each. Estimated using current program numbers.
Before loan payments and taxes, at 730 contracted hours a month and 10¢ power. Rental demand and rates can change; revenue is not guaranteed. Compare packages
Next guide: Build now, host later →
Free quote
See what your site could earn hosting AI compute
Get a free AI compute site assessment from Wolf River Electric: power, solar, hosting space and fiber. No cost, no obligation.