AI compute hosting · Guide 11 of 17

Upper Midwest power prices and what it costs to run an AI server in each state.

8.0¢North Dakota commercial rate
$340a month to power one RTX PRO server in ND
$590a month in Minnesota

Updated November 20, 2026 by Wolf River Electric.

Short answer: North Dakota had the cheapest average commercial electricity in the United States in June 2026, about 8.0 cents per kWh. South Dakota (11.4 cents) and Iowa (12.8 cents) were below the national middle, while Minnesota (13.7), Wisconsin (14.1) and Illinois (14.5) were near or above it, based on U.S. Energy Information Administration data. Powering one 8-GPU RTX PRO server at full use costs about $340 a month in North Dakota and about $590 to $620 in Minnesota, Wisconsin and Illinois, using the program energy estimate. Solar fixes that cost in the higher-rate states. Run your state in the calculator.

Electricity prices in our states

State Commercial, June 2026 National rank (1 = cheapest) Industrial, August 2026
North Dakota 8.0 cents per kWh 1 8.1 cents
South Dakota 11.4 cents 14 9.4 cents
Iowa 12.8 cents 25 9.3 cents
Minnesota 13.7 cents 28 10.0 cents
Wisconsin 14.1 cents 32 10.9 cents
Illinois 14.5 cents 36 11.3 cents

Commercial figures and ranks: June 2026 EIA retail sales data compiled by WattRate (median of states about 13.3 cents). Industrial figures: August 2026 EIA Electric Power Monthly Table 5.6.A compiled by DC Hub (U.S. average about 9.6 cents). Your utility, rate plan and demand charges set your real cost, so we always work from your bills.

What powering an AI server costs by state

State One RTX PRO 6000 server, full use One B300 server, full use
North Dakota About $340 a month About $850 a month
South Dakota About $490 About $1,210
Iowa About $550 About $1,350
Minnesota About $590 About $1,450
Wisconsin About $600 About $1,490
Illinois About $620 About $1,530

Based on the program energy estimate of about 4,300 kWh a month for the RTX PRO server and 10,600 kWh for the B300, at each state's average commercial rate.

Commercial flat roof with a solar array, rooftop inverters and conduit runs installed by Wolf River Electric
Midwest roofs and land make room for the solar that powers AI compute.

What the numbers mean for hosting AI compute

  • Cheap power helps, but demand matters more. Power runs about 4% to 6% of revenue in our examples. A server that is rented most of the time earns far more than the difference between states.
  • North Dakota: grid power is cheap enough that partial solar, or solar sized mainly for the building, can make the most sense.
  • Minnesota, Wisconsin and Illinois: rates are higher and tend to rise, so solar that locks in about 6 cents per kWh over its life is worth more.
  • South Dakota and Iowa: moderate rates and strong solar output make a balanced design work well.
Server cabinet with two AI compute servers installed and open rack space for more nodes later
The same servers cost far less to power in low-rate states like North Dakota and South Dakota.

Other advantages of the Upper Midwest

Cold winters mean cooling equipment works less hard for much of the year, and server heat can even warm a shop or greenhouse (heat reuse). Many of our customers already own the roof, shop or land, which is one of the biggest costs of building a data center from scratch. And distributed sites avoid the long waits large data centers face for new grid connections.

Large commercial rooftop solar array in late-day sun, installed by Wolf River Electric
Our crews build commercial solar in Minnesota, Wisconsin, Iowa, Illinois and the Dakotas.

Do state data center tax breaks apply?

Most state data center sales tax exemptions are written for large facilities with high minimum investments, so do not count on them for a single-server or small site. Ask your tax advisor what applies to your business.

Questions about power costs

Is my rate the same as the state average?

Probably not. Co-ops, municipal utilities and rate plans with demand charges vary widely. Enter your own rate in the calculator.

Which of your states is best for AI compute hosting?

The best site is the one with spare electrical capacity, fiber, space and a good roof or land. Power price is one factor among several. Read the site requirements.

Compare your site's numbers

We use your actual utility rates and bills, not state averages. Request an AI compute site assessment or call (763) 229-6662.

AI compute packages

One 8-GPU server each. Estimated using current program numbers.

Before loan payments and taxes, at 730 contracted hours a month and 10¢ power. Rental demand and rates can change; revenue is not guaranteed. Compare packages

Next guide: Build now, host later →

Free quote

See what your site could earn hosting AI compute

Get a free AI compute site assessment from Wolf River Electric: power, solar, hosting space and fiber. No cost, no obligation.

Get my free quoteCall (763) 229-6662