AI compute site requirements
| Requirement | What it means | Typical for one 8-GPU server |
|---|---|---|
| Electrical capacity | A dedicated circuit and enough spare service capacity for the server, cooling and UPS | About 9.4 kW (RTX PRO 6000) or 18.5 to 18.8 kW (B200, B300) of site power per server, including cooling and UPS, per current program specs |
| UPS | Battery-backed power that bridges the first seconds to minutes of an outage | Sized to the server load |
| Cooling | Equipment that removes the server's heat, which equals nearly all the power it uses | About 24,000 BTU per hour (2 tons) for RTX PRO; about 49,000 BTU per hour (4 tons) for B200 or B300 |
| Fiber internet | A business-grade, synchronous fiber connection | About 2 Gbps recommended; roughly $200 to $330 a month |
| Space | Indoor, conditioned, clean and dry, with room to service the cabinet | A small dedicated room or secured area |
| Physical security | Locked access, limited key holders, cameras or logs as the operator requires | Documented access procedures |
| On-site access | Someone who can let a technician in when hardware needs hands | Occasional visits |

The infrastructure build we handle
- Load calculation and electrical service upgrade if needed
- Dedicated feeders, panels and circuits for the servers, cooling and UPS
- Wiring for the UPS and for cooling equipment, coordinated with your HVAC contractor
- Solar sized for the building and the AI load (solar for AI compute)
- Battery storage and generator integration (battery storage for AI compute)
- Conduit pathways for fiber, coordinated with your internet provider
- Permits, inspections and as-built documentation
Larger builds follow the same approach as our data center electrical construction and commercial electrical work.

SOC 2 compliance for AI compute host sites
SOC 2 is an independent audit, performed by a CPA firm under the AICPA's Trust Services Criteria, of how a service organization protects customer data: security, availability, processing integrity, confidentiality and privacy. Enterprise AI customers often ask their cloud providers for a SOC 2 report.
The audit covers the cloud operator, not your building. But a distributed network is only as strong as its sites, so operators set physical requirements that host sites must meet. A SOC 2-ready site typically has:
| Control area | What the site provides |
|---|---|
| Physical access | A locked room or cage, a short list of authorized people, and an access log or badge record |
| Monitoring | Cameras or alarms where required, and notice to the operator of any security event |
| Environment | Stable temperature and humidity, water and fire protection appropriate to the space |
| Power continuity | A UPS and, ideally, battery or generator backup with documented maintenance |
| Change control | Advance notice before electrical work, moves or shutdowns that affect the server |
| Documentation | Site drawings, equipment lists and procedures the operator can include in its controls |
We build to the operator's site requirements and hand over the documentation. The server does not need access to your business systems, and the network's software keeps each AI customer's work isolated.

Permits, codes and approvals
AI compute sites are built to the National Electrical Code and inspected locally like any commercial electrical project. If you lease your building, you will need the landlord's approval. Check with your insurer about the equipment, and with your attorney and tax advisor about the hosting contract.
Questions about site requirements
Can a server go in my office or shop?
Often, in a small dedicated room with its own cooling. Shared office air conditioning usually cannot remove that much heat, and the noise needs a closed space.
What if fiber is not available yet?
Fiber is the hardest requirement in rural areas. We check provider maps early, and some sites wait for a fiber build before installing servers.
Does Wolf River Electric run the servers?
No. We build the power, solar, battery and electrical infrastructure. The cloud network runs the servers, software and monitoring.
Check your site
We walk your electrical service, space, roof and internet options and tell you what the build takes. Request an AI compute site assessment or call (763) 229-6662.
AI compute packages
One 8-GPU server each. Estimated using current program numbers.
Before loan payments and taxes, at 730 contracted hours a month and 10¢ power. Rental demand and rates can change; revenue is not guaranteed. Compare packages
Free quote
See what your site could earn hosting AI compute
Get a free AI compute site assessment from Wolf River Electric: power, solar, hosting space and fiber. No cost, no obligation.