AI compute hosting · Guide 3 of 17
Fill in one sentence and see what your roof or land could earn by making the power and hosting the compute.
*Estimates using current program numbers (730 contracted hours a month). Not an offer or a promise of income.
Updated November 20, 2026 by Wolf River Electric.
AI compute and solar planner
Fill in the sentence and the results update as you type. Open “Fine-tune” for power rates, offtake and financing. The ribbon chart shows where a year of your electricity goes, and the kWh scale shows why power used by AI nodes is worth so much more than power sold to the grid.
Turn sunlight into AI revenue
Power is the bottleneck of the AI boom. Fill in the sentence and see what your roof or land could earn by making the power and hosting the compute.
I'm in paying $ a month for power. I'll build kW and host AI node, going live , rented % of the time.
Estimated, each month$0
Fine-tune rates, offtake and financing
Every number, year by year
| Year | Cash vs doing nothing |
|---|
Estimates only, not an offer, a quote or a promise of income. AI revenue depends on hours rented, rental prices (which have fallen sharply for older GPUs), uptime and your contract. Server prices are the compute program's current illustrative package prices (about $309,000, $810,000 and $839,000 for one 8-GPU server) and may change; we quote every site. Power rates are June 2026 average commercial rates from U.S. Energy Information Administration data. The AI market value range reflects October 2026 cloud rental rates (about $5.40 to $17.80 per GPU-hour on major clouds) divided by GPU or server power; the host keeps 80% of the network rental revenue, which is priced below major-cloud rates, and the integrator and systems administrator keeps 20%. Export prices and net metering rules depend on your utility and system size. The 30% federal solar credit assumes the system is placed in service by December 31, 2027 under current rules. Not included: depreciation, taxes, insurance, demand charges, maintenance and rate increases. Talk to your tax advisor and attorney before you buy.
Three ways to use the planner
| Your situation | How to fill it in |
|---|---|
| Business adding an AI node | Pick your state and bill, choose “enough solar for my use,” and host one RTX PRO 6000 node right away. The result compares solar plus hosting revenue with your bill today. |
| Solar farm now, AI nodes later | Choose “a solar array of” 400 kW, host 2 nodes going live in year 3, then open Fine-tune and set extra solar to “sold at an offtake price.” The chart shows how AI nodes turn low-value exports into high-value on-site power. |
| You already have solar | Open Fine-tune and check “Solar is already installed.” The planner then shows what AI nodes add when your own solar is their power supply. |

How the planner works
| Input | Starting value | Why |
|---|---|---|
| AI server price | About $308,867 (RTX PRO 6000), $810,136 (B200), $838,881 (B300) for one 8-GPU server, current program package prices; two and three servers are priced per program package | Rounded examples from current program pricing; we quote every site |
| Rental rate and storage | $16.64, $52 and $60 per server-hour for up to 730 contracted hours a month, plus about $750 to $1,500 a month in storage revenue per server | Current program rates; rental prices move with the market |
| Your share | 80% of AI compute and storage revenue; the integrator and systems administrator keeps 20% | Current host share; the network keeps the rest for customers, software and monitoring |
| AI power use | The program energy estimate: about 7 kW for 612 hours a month (RTX PRO) or 14.3 to 14.5 kW for 730 hours (B200, B300) per server at full use. Site power capacity is about 9.4, 18.5 and 18.8 kW per server | Manufacturer ratings and program site assumptions |
| Power rate | June 2026 average commercial rate for your state | U.S. Energy Information Administration data |
| Solar | $2.50 per watt (or $2.25 for the larger farm example), 1,250 kWh per kW per year, 0.5% output loss a year, 30% federal credit | Typical Midwest planning numbers; your site gets its own design |
| Offtake | Net metering credits solar up to your use; extra solar sells at the price you set (8 cents to start; most of our markets credit exports at the retail rate or about half of it) | Export prices depend on your utility and system size |
| Financing | Servers 7 years at 8%; solar and site work 25 years at 7.5% | Match each loan to how long the equipment earns |
What changes the answer most
- Hours rented and rental prices. These drive AI revenue far more than power costs. Rates for older Nvidia H100 GPUs fell from about $7 to $10 per GPU-hour in 2024 to around $2 in late 2025 (Silicon Data), so test a yearly price drop.
- Offtake price. In most of our markets, exported solar is credited at the retail rate or about half of it, so the planner starts at 8 cents. Using it on site for AI nodes raises the value of every kWh. Energy offtake explained.
- When the AI nodes go live. Building solar first locks in today's federal credit; adding nodes later spreads out the big hardware cost.
- Server loan term. Longer terms lower the payment but leave you owing most of the price on an aging server. How we structure financing.

Questions about the planner
Is this passive income?
The network finds AI customers and runs the servers, so day-to-day work is light. But income is not guaranteed: it depends on hours rented and rental prices, and you own the equipment and provide the space, power and internet. What AI hosting really pays.
Why do the farm example's first years show a loss?
In that example, extra solar sells at 8 cents per kWh while the solar loan is being paid. Once the AI nodes go live, the same power is used on site and the picture changes. With net metering or a higher offtake price, the early years look better.
Does it include taxes and depreciation?
No. Eligible businesses may deduct equipment faster under current federal rules, which can improve the result. Ask your tax advisor.
Does it include a battery?
Not as a cost. The “use met directly by solar” slider stands in for what a battery adds. Battery storage for AI compute.
Get real numbers for your site
We price the solar, battery, electrical build and AI nodes together from your real bills and your roof or land. Request an AI compute site assessment or call (763) 229-6662. To compare server packages side by side, see AI compute packages and estimated monthly revenue.
AI compute packages
One 8-GPU server each. Estimated using current program numbers.
Before loan payments and taxes, at 730 contracted hours a month and 10¢ power. Rental demand and rates can change; revenue is not guaranteed. Compare packages
Free quote
See what your site could earn hosting AI compute
Get a free AI compute site assessment from Wolf River Electric: power, solar, hosting space and fiber. No cost, no obligation.