Vehicle-to-grid (V2G): what it is and where it stands
V2G lets an EV send power back to the grid when the utility needs it, and get paid for it. GM is piloting it now. Here is what that means for GM EV owners in Minnesota, Wisconsin, Iowa, Illinois and the Dakotas, and what you can do today.
- V2G, V2H and V2L explained
- GM pilots as of November 2026
- What Midwest GM owners can do today
- Backup that works now with V2H
940+ five-star Google reviews
Short answer: Vehicle-to-grid (V2G) means your EV sends energy back through your home to the utility grid, usually for pay during peak demand. As of November 2026, GM's V2G programs are pilots: one with Southern California Edison and WeaveGrid in California, and testing with DTE Energy in Michigan. We are not aware of a residential V2G payment program from utilities in our six states yet. What GM EV owners here can use today is vehicle-to-home (V2H) backup and, where offered, managed charging programs.
V2G, V2H, V2L and managed charging
They get used interchangeably, but they do different jobs.
| Term | What it means | Available to GM owners here today? |
|---|---|---|
| V2H (vehicle-to-home) | The EV powers your house in an outage through a Home Hub and inverter | Yes, with the GM Energy V2H Bundle |
| V2G (vehicle-to-grid) | The EV sends energy through your home to the utility grid when the utility asks, usually for pay | Not yet; GM pilots are in California and Michigan |
| V2L (vehicle-to-load) | Plugging tools or appliances into outlets on the vehicle | On many GM EVs, depending on model and options |
| Managed charging | The utility shifts when your EV charges, often for bill credits | Through some utilities; check GM Energy and your utility |
Where GM's vehicle-to-grid work stands
June 2026: testing with utilities
GM said it was actively testing V2G, including with DTE Energy in employee homes in Michigan, and that paid participation is still limited.
July 2026: firmware for V2H owners
GM announced V2G capability for existing GM Energy V2H customers through a firmware update, to be rewarded where utility programs are available.
November 2026: first California pilot
GM Energy and WeaveGrid opened a program for select Southern California Edison customers. Eligible participants may get up to $8,000 toward a GM Energy V2H system and up to $8,099 toward installation and interconnection through the California Energy Commission.
Next: simpler AC equipment
GM says today's systems use DC technology with a wall inverter, and it is pursuing AC-based V2G and joining an industry task force on standards and utility interconnection.
Source: GM news releases from June, July and November 2026. Program terms, eligibility and payments are set by the utility and program.
What you can do today
- Back up your home with your EV. The GM Energy V2H Bundle works now and is the equipment GM has said will receive V2G capability through firmware.
- Shift your home onto stored energy. A PowerBank can carry the house during expensive hours on time-of-use rates.
- Join managed charging if your utility offers it. GM Energy works with 13 utilities on programs that pay bill credits for flexible charging.
- Add solar. Selling solar power back under your utility's net metering or buyback rules is available today. See solar plus GM Energy.
Installing V2H now does not guarantee a future V2G program or payment in your area. When a utility here launches one, we will help existing customers sign up.

Questions we hear
Can I sell power from my GM EV to my utility in Minnesota?
Do I need different equipment for V2G?
Will V2G wear out my battery?
What is the difference between V2G and V2H?
Should I wait for V2G before buying?
Get a free GM Energy consultation
We check your electrical service, agree which circuits matter to you, and confirm the price before anything is ordered. Our own licensed electricians handle the survey, permits, utility paperwork, installation and commissioning.
Keep reading
Wolf River Electric is an independent, approved GM Energy installer. GM, GM Energy, Chevrolet, GMC, Cadillac and model names are trademarks of General Motors; product images courtesy of GM. Starting prices are Wolf River Electric installation packages, confirmed after a free consultation; sales tax is added at invoice. Backup times are estimates that depend on your home, weather, settings and battery condition. Incentives change; we confirm what applies at the time of sale.
