Installing solar on a commercial building might seem like a big task, but with the right team, it’s a straightforward process from start to finish. So, if you’re asking, what happens during the installation process, here’s a step-by-step look at what to expect when you partner with an experienced installer like Wolf River Electric.

From system design to flipping the switch, every stage is handled with care, coordination, and attention to detail.

Step 1 – Site Assessment and Custom System Design

The process begins with a detailed review of your property and energy usage. Our team visits your site or conducts a remote assessment using aerial imagery and software solutions to evaluate your roof condition, shade patterns, and power needs.

From there, we create a custom system design tailored to your building and infrastructure. This includes recommendations for panel layout, inverter selection, and expected production. Once you’ve reviewed and approved the plan, we’re ready to move forward with the process. 

Step 2 – Permits and Utility Applications

Solar installation involves coordination with both local authorities and utility providers. Wolf River Electric handles all permitting, including electrical, structural, and zoning applications required by your city or county.

We also submit an interconnection request to your utility company to ensure the system can be safely connected to the grid. This stage can take time depending on your location, but we stay on top of the paperwork so you don’t have to.

Step 3 – Delivery and Installation

Once permits are approved and materials are ready, installation begins. Equipment, including solar panels, inverters, racking, and wiring, is delivered to your site and staged for install.

Most commercial systems take a few days to a few weeks to complete, depending on size and complexity. Our crews install all major components with a focus on safety, efficiency, and minimal disruption to your operations. Each part of the system is carefully inspected and tested as it’s installed to ensure quality control.

Step 4 – Final Inspection and Utility Approval

After installation is complete, a local building inspector reviews the system to confirm it meets code and permitting requirements. Once inspection is passed, your utility company gives the final go-ahead for interconnection.

At this point, your solar system is officially live and connected to the grid. We also walk you through any monitoring tools or dashboards so you can track performance in real time.

Step 5 – Ongoing Support and System Performance

The process doesn’t end once the system is switched on. At Wolf River Electric, we provide continued support to make sure your investment keeps delivering.

Our team offers system monitoring assistance, responds to service questions, and supports warranty claims when needed. You’ll also receive regular performance updates to ensure everything is operating as expected.

With the right partner, going solar doesn’t have to be complicated. And now that you know what happens during the installation process, you’re one step closer to powering your building with clean, reliable energy. Are you ready to reach out and get your free quote to start your solar installation process?